Skip to content
SmartDailyCalculator

Reorder Point Calculator

Enter the average number of units sold or used per day, the lead time in days for a new order to arrive, and the safety stock you want to keep. The calculator shows the reorder point—the inventory level at which you should reorder—and the demand expected during the lead time.

Reorder point (units)

190

Average daily demand
20
Lead time (days)
7
Lead-time demand (units)
140
Safety stock (units)
50
Reorder point (units)
190

This estimates when to reorder, not how much to order. Pair with an order-size tool such as Economic Order Quantity for order quantity.

Demand and lead time are averages you supply. Variability in either can cause stockouts before the reorder point is reached.

Safety stock is a buffer you choose; it is not calculated here from demand variance.

Estimate only: Results are estimates for planning and education. They are not a quote, an offer of credit or a guarantee of any financial outcome. Actual rates, fees, taxes and returns vary; check with a qualified financial professional before making decisions.

How to use the Reorder Point Calculator

  1. Enter average daily demand in units.
  2. Enter the lead time in days from placing an order to receiving it.
  3. Enter the safety stock units you want to hold as a buffer.
  4. Read the reorder point and the lead-time demand component.

Reorder point formula

Lead-time demand=average daily demand×lead time days
Reorder point=lead-time demand+safety stock

Where:

averagedailydemand
= units sold or used per day on average
leadtimedays
= days from placing an order to receiving the goods
safetystock
= extra units held as a buffer against demand or lead-time variability
Show as plain text

Lead-time demand = average daily demand × lead time in days Reorder point = lead-time demand + safety stock

Multiply average daily demand by lead time to get the units expected to be consumed while waiting for an order. Add the safety-stock buffer to get the inventory level at which a new order should be placed.

Assumptions and limitations

  • Demand and lead time are treated as constant averages. Seasonality, trends, and supply variability are not modeled.
  • Safety stock is an amount you choose; this calculator does not derive it from service-level targets.
  • Reorder point triggers an order; it does not set the order quantity.

Example: 20 units per day, 7-day lead time, 50 units safety stock

  1. Lead-time demand: 20 units/day × 7 days = 140 units.
  2. Reorder point: 140 + 50 safety stock = 190 units.
  3. When inventory reaches 190 units, place a new order.

When to use the Reorder Point Calculator

  • Knowing when to place a purchase order so stock does not run out before delivery.
  • Setting a reorder trigger in an inventory system.
  • Separating the lead-time demand from the safety-stock buffer.

Reorder Point Calculator FAQs

Is this the same as inventory turnover?

No. Inventory turnover measures how fast stock sells over a historical period. Reorder point estimates when to place a future order based on lead-time demand and safety stock.

Does this tell me how much to order?

No. It tells you when to reorder. Use an Economic Order Quantity calculator to decide the order size.

What if demand changes during the lead time?

This calculator uses a single average daily demand. If demand varies widely, increase safety stock or review more frequently.

References

How this calculator was built and tested is explained in our methodology. Spotted a problem? Let us know.