How to use the Economic Order Quantity Calculator
- Enter annual demand for the item in units.
- Enter the fixed cost of placing one order.
- Enter the holding cost to store one unit for one year.
- Read EOQ, orders per year, annual ordering cost, annual holding cost, and total annual cost.
Economic order quantity formula
Where:
- = units needed per year
- = fixed cost to place one order (not per unit)
- = cost to store one unit for one year
Show as plain text
EOQ = √(2 × annual demand × order cost ÷ holding cost per unit per year) Orders per year = annual demand ÷ EOQ Annual ordering cost = orders per year × order cost Annual holding cost = (EOQ ÷ 2) × holding cost per unit Total annual cost = ordering cost + holding cost
EOQ balances the cost of placing frequent small orders against the cost of holding large inventories. The square-root formula gives the quantity where annual ordering cost equals annual holding cost.
Assumptions and limitations
- Demand, order cost, and holding cost are constant over the year. No seasonality, quantity discounts, or lead-time variability is modeled.
- No stockout costs or service-level targets are included. This is a basic EOQ model only.
- All values are supplied by the visitor; no supplier or market data is used.
Example: 3,600 units annual demand, $50 order cost, $2 holding cost per unit per year
- EOQ: √(2 × 3,600 × $50 ÷ $2) = √180,000 ≈ 424.26 units.
- Orders per year: 3,600 ÷ 424.26 ≈ 8.49.
- Annual ordering cost: 8.49 × $50 ≈ $424.26.
- Annual holding cost: (424.26 ÷ 2) × $2 ≈ $424.26.
- Total annual cost: ≈ $848.53.
When to use the Economic Order Quantity Calculator
- Finding the order size that balances ordering costs against holding costs.
- Comparing current order quantities to a modeled cost-minimizing quantity.
- Estimating annual inventory cost under the EOQ assumptions.
Economic Order Quantity Calculator FAQs
Does EOQ tell me when to order?
No. EOQ tells you how much to order. Use the Reorder Point calculator to decide when to place the order.
Can I order a fractional quantity?
The model returns a continuous value, but real orders are in whole units. Round EOQ to a practical whole quantity before ordering.
Does EOQ consider stockout costs?
No. This basic EOQ model excludes stockout costs, lead-time variability, and quantity discounts.
References
How this calculator was built and tested is explained in our methodology. Spotted a problem? Let us know.