How to use the Uptime Calculator
- Enter the total measurement period and observed downtime in the same unit.
- Enter an optional target uptime percentage.
- Review calculated uptime and the maximum downtime allowed at that target.
Uptime and availability formula
Where:
- = observed uptime percentage
- = total measurement period, in hours
- = observed downtime, in hours
- = downtime budget for the target
- = target uptime percentage
Show as plain text
Uptime (%) = (total period − downtime) ÷ total period × 100 Downtime budget = total period × (1 − target uptime fraction)
The availability percentage is the share of the measurement period that was not recorded as downtime.
The target downtime budget is the period multiplied by the fraction not covered by the uptime target. The target comparison is arithmetic only; contract definitions may differ.
Assumptions and limitations
- The total period is entered in days and downtime in hours; both are converted to hours.
- Downtime must be between zero and the total period.
- The result does not determine contractual SLA compliance; exclusions and measurement rules depend on the agreement.
Example: One hour of downtime in a 30-day period
- A 30-day period contains 30 × 24 = 720 hours.
- Uptime = (720 − 1) ÷ 720 × 100 ≈ 99.8611%.
- At a 99.9% target, the budget is 720 × 0.001 = 0.72 hours, so one hour exceeds it by 0.28 hours.
When to use the Uptime Calculator
- Measure observed availability over a reporting interval.
- Translate an availability target into a downtime budget for the entered period.
- Estimate file transfer time with the download time calculator or required throughput with the bandwidth calculator.
Uptime Calculator FAQs
How is uptime percentage calculated?
Subtract recorded downtime from the full measurement period, divide by the period and multiply by 100.
What does 99.9% uptime allow in a month?
The allowance depends on the exact period length. For the entered 30-day interval, 99.9% corresponds to 0.72 hours (43.2 minutes) of downtime.
Does this calculate contractual SLA compliance?
No. It applies the entered period and downtime directly. An SLA may exclude planned maintenance, define a specific measurement window or use other rules.
How this calculator was built and tested is explained in our methodology. Spotted a problem? Let us know.